Solar Portfolio
NOTEWORTHY PROJECTS
First of its kind, largest in its area, and other notable projects
-
Caledonia, WI
Year Complete: 2024
Size: 6.8MWdc
Role: Installation Partner
Equipment: Pieper oversaw civil engineering, fencing, SWPPP, pile driving; assembled all major equipment; and completed all DC and AC wiring for this single axis tracker system.Other: Pieper will be responsible for the Operations and Maintenance (O&M) for this site starting in 2025.
-
Cedarburg, WI
Year Complete: 2024
Size: 8.6MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system. -
Cottage Grove, WI
Year Complete: 2023
Size: 22MWdc
Role: Installation PartnerEquipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system.
Other: This is the largest PV ground-mount in Dane County and contributed towards the County meeting their goal of powering 100% of their county facilities with renewable electricity. -
Menomonee Falls, WI
Year Complete: 2021
Size: 2.9MWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.
Other: Largest PV roof-mount system in Wisconsin
GALLERY
-
New Berlin, WI
Year Complete: 2024
Size: 332kWdc
Role: Self-Developed and Installed
Equipment: Pieper developed this solar project to help this industrial customer achieve their green energy goals and obtain LEED Building Certification. The PV system was completed in conjunction with full scale electrical construction on this new construction project. -
Cottage Grove, WI
Year Complete: 2024
Size: 357kWdc
Role: Installation Partner
Equipment: Pieper worked in partnership with a developer to complete this ground mount array. We oversaw the foundation installation, assembled all major equipment, including over 655 solar modules and 5 inverters, and completed all DC and AC wiring. -
Mt. Pleasant, WI
Year Complete: 2023
Size: 115kWdc
Role: Self-Developed and Installed
Equipment: Pieper developed this project to offset a portion of this health clinic’s electrical consumption. We designed, engineered, permitted and constructed this ballasted, roof-mount system, as well as applied for the Focus on Energy rebate on the customer’s behalf. -
Waukesha, WI
Year Complete: 2023
Size: 54kWdc
Role: Self-Developed and Installed
Equipment: Equipment: Pieper developed this project to offset a portion of this health clinic’s electrical consumption. We designed, engineered, permitted and constructed this ballasted, roof-mount system, as well as applied for the Focus on Energy rebate on the customer’s behalf. -
Madison, WI
Year Complete: 2023
Size: 100kWdc
Role: Self-Developed and InstalledEquipment: Pieper added to an existing PV array and sized it to fall within MG&E’s net metering limit. We assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring. We also applied for the Focus on Energy rebate on the customer’s behalf.
-
Fitchburg, WI
Year Complete: 2023
Size: 134kWdc
Role: Installation Partner
Equipment: Pieper worked in partnership with a developer to complete this fixed tilt ground mount array. We oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system. -
Clinton, WI
Year Complete: 2023
Size: 155kWdc
Role: Installation Partner
Equipment: Pieper worked in partnership with a developer to complete this 10 degree tilt, ballasted roof mount array. We assembled all major equipment, including over 280 solar modules and 1 SolarEdge inverter, and completed all DC and AC wiring. -
Milwaukee, WI
Year Complete: 2023
Size: 1MWdc
Role: Installation Partner
Equipment: Pieper worked in partnership with a developer to complete this 10 degree tilt, ballasted roof mount array. We assembled all major equipment, including over 2,500 solar modules, and completed all DC and AC wiring. -
Dodgeville, WI
Year Complete: 2022
Size: 371kWdc
Role: Installation Partner
Equipment: Pieper worked in partnership with a developer to complete this 10 degree tilt, ballasted roof mount array. We assembled all major equipment, including a robust data acquisition system (DAS), and completed all DC and AC wiring. -
Beloit, WI
Year Complete: 2021
Size: 5.91MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracking system, which was one of the first of its kind of this size in the state -
Racine, WI
Year Complete: 2021
Size: 1.88MWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring. -
Pewaukee, WI
Year Complete: 2021
Size: 2.85MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system. -
Cudahy, WI
Year Complete: 2020
Size: 2.85MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system. -
Milwaukee, WI
Year Complete: 2020
Size: 2.8MWdc
Role: Installation Partner
Equipment: Pieper oversaw raking assembly, installed all major equipment, and completed all DC and AC wiring for this fixed-tilt, ballasted ground mount system.
Other: This non-penetrating ground mount system was placed on one of Milwaukee’s landfills. -
Port Washington, WI
Year Complete: 2020
Size: 257Wdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring. -
Madison, WI
Year Complete: 2018
Size: 2.2MWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.
Other: Formerly largest PV roof-mount system in Wisconsin. Three different racking styles installed, including ballasted, flush-mount, and east/west oriented.
SERVICE
-
Milwaukee, WI
Year Array Installed: 2012
Role: O&M
Equipment: Pieper inspected and reported on components in various sections of this ballasted, tracking ground mount array. Damaged components were decommissioned and salvageable components were reconfigured to mitigate future environmental damage. -
Oak Creek, WI
Year Array Installed: 2014
Role: O&M
Equipment: Pieper performed general maintenance on the rooftop and ground arrays, including inspection of modules, racking, DC wiring, grounding, and inverters. Failed inverters were replaced and comprehensive diagnostic testing was performed on the tracker components. -
Mequon, WI
Year Array Installed: 2016
Role: O&M
Equipment: Pieper performed general maintenance on the stationary and tracking ground arrays. Recommendations given for identified areas of concern. -
Cedarburg, WI
Year Array Installed: 2021
Role: O&M
Equipment: Pieper called upon to troubleshoot and repair failed inverter -
Mt. Pleasant, WI
Year Array Installed: 2021
Role: O&MEquipment: Pieper called upon to troubleshoot and repair failed inverter
-
Mequon, WI
Year Array Installed: 2022
Role: O&M
Equipment: Pieper called upon to troubleshoot and repair failed inverter in ground mount installation