First of its kind, largest in its area, and other notable projects developed by Pieper Electric or installed in partnership with project developers

  • Cottage Grove, WI; Wisconsin; Dane County; Renewable Energy; Photovoltaic; PV; Clean Energy; Solar

    Cottage Grove, WI

    Year Complete: 2023
    Size: 22MWdc
    Role: Installation Partner

    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system.

    Other: This is the largest PV ground-mount in Dane County and contributed towards the County meeting their goal of powering 100% of their county facilities with renewable electricity.

  • Cedarburg, WI

    Cedarburg, WI

    Year Complete: 2024
    Size: 8.6MWdc
    Role: Installation Partner

    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system.

  • Menomonee Falls, WI

    Menomonee Falls, WI

    Year Complete: 2021
    Size: 2.9MWdc
    Role: Installation Partner

    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

    Other: Largest PV roof-mount system in Wisconsin

  • Madison, Wisconsin; Dane County; Renewable Energy; Photovoltaic; PV; Clean Energy; Solar

    Madison, WI

    Year Complete: 2018
    Size: 2.2MWdc
    Role: Installation Partner

    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

    Other: Formerly largest PV roof-mount system in Wisconsin. Three different racking styles installed, including ballasted, flush-mount, and east/west oriented.

  • Cottage Grove, WI; Wisconsin; Dane County; Renewable Energy; Photovoltaic; PV; Clean Energy; Solar

    Cottage Grove, WI

    Year Complete: 2023
    Size: 22MWdc
    Role: Installation Partner

    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system.

    Other: This is the largest PV ground-mount in Dane County and contributed towards the County meeting their goal of powering 100% of their county facilities with renewable electricity.

  • Cedarburg, WI

    Cedarburg, WI

    Year Complete: 2024
    Size: 8.6MWdc
    Role: Installation Partner

    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system.

  • Menomonee Falls, WI

    Menomonee Falls, WI

    Year Complete: 2021
    Size: 2.9MWdc
    Role: Installation Partner

    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

    Other: Largest PV roof-mount system in Wisconsin

  • Madison, Wisconsin; Dane County; Renewable Energy; Photovoltaic; PV; Clean Energy; Solar

    Madison, WI

    Year Complete: 2018
    Size: 2.2MWdc
    Role: Installation Partner

    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

    Other: Formerly largest PV roof-mount system in Wisconsin. Three different racking styles installed, including ballasted, flush-mount, and east/west oriented.

  • Mt. Pleasant, WI

    Mt. Pleasant, WI

    Year Complete: 2023
    Size: 115kWdc
    Role: Self-Developed and Installed
    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

  • Waukesha, WI

    Waukesha, WI

    Year Complete: 2023
    Size: 54kWdc
    Role: Self-Developed and Installed
    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

  • Madison, WI

    Madison, WI

    Year Complete: 2023

    Size: 100kWdc

    Role: Self-Developed and Installed

    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

  • Fitchburg, WI

    Fitchburg, WI

    Year Complete: 2023
    Size: 134kWdc
    Role: Installation Partner
    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system.

  • Milwaukee, WI

    Milwaukee, WI

    Year Complete: 2023
    Size: 134kWdc
    Role: Installation Partner
    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system.

  • Dodgeville, WI

    Dodgeville, WI

    Year Complete: 2022
    Size: 371kWdc
    Role: Installation Partner
    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

  • Beloit, WI

    Beloit, WI

    Year Complete: 2021
    Size: 5.91MWdc
    Role: Installation Partner
    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracking system.

  • Racine, WI

    Racine, WI

    Year Complete: 2021
    Size: 1.88MWdc
    Role: Installation Partner
    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.

  • Pewaukee, WI

    Pewaukee, WI

    Year Complete: 2021
    Size: 2.85MWdc
    Role: Installation Partner
    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system.

  • Cudahy, WI

    Cudahy, WI

    Year Complete: 2020
    Size: 2.85MWdc
    Role: Installation Partner
    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system.

  • Milwaukee, WI

    Milwaukee, WI

    Year Complete: 2020
    Size: 2.8MWdc
    Role: Installation Partner
    Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt, ballasted ground mount system.
    Other: This non-penetrating ground my system was placed on one of Milwaukee’s landfills

  • Port Washington, Wi

    Port Washington, Wi

    Year Complete: 2020
    Size: 257Wdc
    Role: Installation Partner
    Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.