Solar Portfolio
Noteworthy Projects
First of its kind, largest in its area, and other notable projects developed by Pieper Electric or installed in partnership with project developers
-
Cottage Grove, WI
Year Complete: 2023
Size: 22MWdc
Role: Installation PartnerEquipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system.
Other: This is the largest PV ground-mount in Dane County and contributed towards the County meeting their goal of powering 100% of their county facilities with renewable electricity. -
Cedarburg, WI
Year Complete: 2024
Size: 8.6MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system. -
Menomonee Falls, WI
Year Complete: 2021
Size: 2.9MWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.
Other: Largest PV roof-mount system in Wisconsin -
Madison, WI
Year Complete: 2018
Size: 2.2MWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.
Other: Formerly largest PV roof-mount system in Wisconsin. Three different racking styles installed, including ballasted, flush-mount, and east/west oriented.
-
Cottage Grove, WI
Year Complete: 2023
Size: 22MWdc
Role: Installation PartnerEquipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system.
Other: This is the largest PV ground-mount in Dane County and contributed towards the County meeting their goal of powering 100% of their county facilities with renewable electricity. -
Cedarburg, WI
Year Complete: 2024
Size: 8.6MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracker system. -
Menomonee Falls, WI
Year Complete: 2021
Size: 2.9MWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.
Other: Largest PV roof-mount system in Wisconsin -
Madison, WI
Year Complete: 2018
Size: 2.2MWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.
Other: Formerly largest PV roof-mount system in Wisconsin. Three different racking styles installed, including ballasted, flush-mount, and east/west oriented. -
Mt. Pleasant, WI
Year Complete: 2023
Size: 115kWdc
Role: Self-Developed and Installed
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring. -
Waukesha, WI
Year Complete: 2023
Size: 54kWdc
Role: Self-Developed and Installed
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring. -
Madison, WI
Year Complete: 2023
Size: 100kWdc
Role: Self-Developed and Installed
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.
-
Fitchburg, WI
Year Complete: 2023
Size: 134kWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system. -
Milwaukee, WI
Year Complete: 2023
Size: 134kWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system. -
Dodgeville, WI
Year Complete: 2022
Size: 371kWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring. -
Beloit, WI
Year Complete: 2021
Size: 5.91MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this single axis tracking system. -
Racine, WI
Year Complete: 2021
Size: 1.88MWdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring. -
Pewaukee, WI
Year Complete: 2021
Size: 2.85MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system. -
Cudahy, WI
Year Complete: 2020
Size: 2.85MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt ground mount system. -
Milwaukee, WI
Year Complete: 2020
Size: 2.8MWdc
Role: Installation Partner
Equipment: Pieper oversaw pile driving, assembled all major equipment, and completed all DC and AC wiring for this fixed-tilt, ballasted ground mount system.
Other: This non-penetrating ground my system was placed on one of Milwaukee’s landfills -
Port Washington, Wi
Year Complete: 2020
Size: 257Wdc
Role: Installation Partner
Equipment: Pieper assembled all major equipment for this ballasted, roof-mount system and completed all DC and AC wiring.